As at 30 September 2020, the IPPs dashboard is as follows
Technology | Number of projects | Location of Plants | Installed Total Capacity (MW) | Operational |
Solar | 55 | 2x Manicaland
12x Mash East 5 x Masvingo 1 x Mash Central 4 x Harare 9 x Midlands 3 x Mat North 6 x Mat South 2 x Bulawayo 11 x Mash West |
1190.88 MW | 5 |
Coal-fired | 5 | 4x Mat North
1x Midlands |
5650 MW | – |
Mini Hydros | 22 | 2 x Masvingo
20 x Manicaland |
97.02 MW | 9 |
Bagasse (Co-gen) | 3 | 1 x Manicaland
2 x Masvingo |
92.3 MW | 3 |
Gas Fired | 1 | Manicaland | 345 MW | – |
Diesel | 1 | Mashonaland East | 200 MW | – |
Biomass | 1 | Manicaland | 0.5MW | – |
Solar/diesel | 1 | Mat South | 2.25MW | 1 |